↑ Return to Financial

Dev. Activities

BIWTA’s Development Activities
A. List of Completed Projects of BIWTA (From 1997-June 2016):
A-I. Projects completed under Development Budget (ADP):
                                                                                                                                                  (Taka in Lakh)
SL. No.
Name of Project
Implementation Period
Actual Expenditure incurred
01.
Development of H.F Tele-communication system.
July 1994-June 1997
273.94
02.
Construction of R.C.C Jetty with approach road and other allied facilities of Baraghope and Sattaruddinghat in Kutubdia off-shore island.
July 1995-June 1997
637.73
03.
Dredging of Railways Ferry routes across the Jamuna river for maintaining navigability during dry season.
July 1995-Jan’ 1997
409.98
04.
Construction of permanent ferry ghat, parking yard & allied facilities at Notakhola instead of Nagarbari.
Sept’ 1995-June 1997
225.00
05.
Procurement of 5Nos. survey work boat and 3 Nos. accommodation barges.
Jan’ 1995-Sept’ 1997
724.10
06.
Dredging of existing waterways and improvement of dredging operation & efficiency.
July 1992-June 2000
6806.08
07.
Procurement of Aids to Navigation.
July 1994-June 2000
4949.68
08.
Replacement of Electronic position fixing system.
July 1996-June 2000
1860.81
09.
Construction of ferry terminal including allied facilities at Paturia, Downstream of Aricha.
July 1996-June 2000
215.18
10.
Up-grading of Deck personnel training centre.
Dec’ 1996-June 2000
961.08
11.
Landing facilities at 7 Places in inland waterways of Chittagong Hill Tracts Area.
July 1999- Dec’ 2000
156.42
12.
BIWTA Flood Rehabilitation Project, 1998.
July 1999- Dec’ 2000
3825.95
13.
Establishment of 5 Boat Centers at different places of the country for providing technical assistance to develop country boat sector.
Dec’ 1997-June 2000
422.47
14.
Mapping for development of Bangladesh, 1st phase coastal area.
Oct’ 1989- Dec’ 2001
9888.40
15.
Development of 175 Nos. launch landing stations in rural areas of Bangladesh.
Mar 1997- Dec’ 2000
5854.44
16.
Hydraulic and Morphological study for the selection of a site for ferry ghats alternative to Nagarbari/ Notakhola.
Sept’ 2001-June 2003
59.00
17.
Feasibility study and detail design for providing landing facilities at 3(three) coastal Up-zillas (Cox's Bazar Sadar, Sandwip & Monpura) for river crafts.
Jan’ 2003- Dec’ 2003
20.00
18.
Construction of ferry terminal and ferry ghats including other allied facilities of Harinaghat and Alubazar for introducing Ferry services between Chandpur-Shariatpur waterways
July 1999 – June 2004
629.56
19.
Rehabilitation at devastated Chandpur river-port terminal building and landing facilities of caused by river erosion
July 2002 – June 2004
176.87
20.
Introduction of waterways around Dhaka City, 1st phase: Development of navigability and providing landing facilities from Sadarghat to Ashulia Bridge.
July 2000 – June 2005
3599.64
21.
Establishment of river port facilities at Munshigonj Mirkadim area under Munshigonj District.
July 2003 -June 2005
817.84
22.
Construction of bus and truck terminal including infrastructure at paturia ferry ghat.     
July2003 – June 2006
313.84
23.
Construction of water crafts stations including landing facilities at 3 (Three) coastal Upzillas (Cox's bazar shadar, Sandwip & Monpura) in the coastal area.            
Jan’ 2006-June 2007
951.39
24.
Installation, Reinstallation, Modernization and expansion of navigational equipment for smooth & safe day-night navigation for IWT vessels.
Jan’ 2005-June 2007
2384.04
25.
Widening and development of navigability by dredging of Gabkhan canal connecting Dhaka-Mongla and Chittagong-Mongla river route .
July 2004-Dec’ 2007
1739.61
26.
Development of navigability of 4 nos. important inland water ways by dredging
Jan’ 2005-June 2008
4605.27
27.
Long-term dredging Programme for maintaining waterways navigable including procurement of 3 No. dredgers and 1 no. booster pump with other accessories.       
July 1998 – June 2009
3573.91
28.
Construction of Pontoons in Inland River Ports
Jan’ 2006- June 2009
9004.93
29.
Rehabilitation and Reconstruction of infrastructures and other facilities damaged by cyclone, ' SIDR'-2007.
July 2008 – June  2009
574.18
30.
Rehabilitation of BIWTA's 2(two) Nos. Dredger and related Ancillary crafts ( 1st Revised ).
July 2006 – June 2010
3354.30
31.
Construction of port facilities in order to prevent unauthorized encroachment of Buriganga river and its foreshore land
July 2006 – June 2012
3500.00
32.
Extension of newly constructed RCC jetty at Guptachara at Sandwip.
July 2009-June 2012
1240.53
33.
Development and Modernization of Barisal River Port
July 2009-June 2012
1760.00
34.
Construction of RCC Jetty at Kumira, Chittagong Port
Jan’ 2010-Dec’ 2012
1210.00
35.
Construction of port facilities in order to prevent unauthorized encroachment of the Buriganga river and its foreshore land( 1st Revised interiterm adjusted)
July 2006- June 2012
3495.73
36.
Development and Modernization of Barisal River Port
July 2009- June 2012
1556.84
37.
Construction of RCC Jetty at Kumira, Chittagong
Jan’ 2010 – June 2012
986.30
38.
Extension of Newly Constructed RCC jetty at Guptachara Sandwip(1st Revised)                 
July 2009- June 2012
1353.62
39.
Procurement of 1(One) dredgers with other accessories
July 2008- June 2012
2201.41
40.
Introduction of Circular Waterways in and around Dhaka city (2nd phase)(1st Revised)                 .
July 2007- June 2013
5454.114
41.
Establishment of River port at Nowapara, Bhairab – Ashuganj and Barguna               
July 2008 – June 2013
1491.60
42.
Salvage vessel Procurement
Jan’ 2006 –June  2013
33847.95
43.
Dredging of Madaripur-Charmuguria-Takerhat-Gopalganj River Route (2nd  Revised)                 
Jan’ 2011 -June 2016
11602.24
44.
Procurement of 2 dredgers, crane boats, crew house boat and tug boat with other accessories for maintaining the navigability of inland waterways(2nd  Revised)                 
Jan’ 2009 -June 2016
14226.11
 
 
A-II. Projects completed under Agency’s Own Fund: 
(Taka in Lakh)
SL
No
.
Name of Project
Implementation Period
Actual Expenditure incurred
01
Procurement of 1(one) dredger with ancillary accessories
July 2008 – June 2012
2210.00
02.
Construction of Inland Container River Terminal (ICT), Pangaon
July 2005 – June 2011
17757.00
 
 
B. List of  On-going Projects  (2016-17)
B-I. Projects under Development Budget (ADP):
 
                                                                                                                                                 (Taka in Lakh)
SL. No.
Name of Project
Implementation Period
Estimated Cost
01.
Establishment of Inland Container River Port at Ashuganj.
Jan’ 2011 –June 2019 (Proposed)
46100.00
02.
Procurement of 10 dredgers, crane boats, tugs, officer house boats and crew house  boats with other accessories (2nd  Revised) .
July 2011 –June 2018
74560.22
03.
Dredging on 12 important River Routes.
Oct’ 2011 – June 2017
50846.00
04.
Capital Dredging of 53 river routes in Inland waterways (1st phase: 24 River Routes).
July 2012 – June 2019
192300.00
05.
Establishment of Ship Personnel Training Institute, Madaripur.
July 2013–June 2017
3987.00
06.
Development of launch ghat and wayside ghat in rural area of Bangladesh (1st   Revised) .
July 2013-      2017
8531.30
07.
Procurement of 20 dredgers with Ancillary Equipment and Accessories.
July 2015–Dec’ 2019
204799.87
 
 
B-II.  Projects under Agency’s Own Fund: 
 
(Taka in Lakh)
SL
No
.
Name of Project
Implementation Period
Estimated Cost
01.
Extention of Sadarghat Terminal Building at Dhaka Port
March 2014 –June 2017
1910.51
02.
Development of Port facilities at different landing stations of the southern region
March 2014 –June 2018
3250.00
03.
Development of Sadarghat to Shasanghat Road under Dhaka River Port
Jan’ 2015 – June 2017
1990.90
 
 
C. Future Programme
C-I. Projects proposed under Annual Development Programme (ADP) :
 
SL. No.
Name of Project
01.
Modernization of DGPS Beacon Stations.
 
02.
Establishment of Ferry Ghat including allied facilities at Balashi and  Bahadurabad.
03.
Construction & placement of Special type terminal Pontoons with allied facilities.
04.
Establishment of 2nd Terminal Facilities at Shacan Ghat Area under Dhaka River Port.
05.
Construction  of walkway and bank protection on evicted foreshore land of Buriganga, Shitalakhya and Turag (partly)
06.
Procurement and Installation of Digital Gauges and data collection through Global System for Mobile (GSM) network
07.
Development and Re-habilitation of Dharla, Dhudkumar, Labukhali and old Brahmaputra
08.
Procurement and Installation of Navigational aids for Inland and Coastal areas.
09.
Development of Sadarghat to Shasanghat Road and ancillary Tnfrastractues under Dhaka River Port (1st Revised)
10.
Establishment of River Port including allied facilities at Nagarbari
11.
Modernization of River Port including allied facilities at Paturia and Daulatdia.
12.
Establishment of Ferry Ghat including allied facilities at Naradaha
 
                              
C-II. Project proposed under Foreign Aids:
 
SL No.
Name of the project
01.
Bangladesh Waterway Transport Project-1
 
 
C-III. Project proposed under Public-Private Partnersip:
SL No.
Name of the project
01.
Construction & Operation of Inland Container Terminal (ICT) at Khanpur, Narayanganj